Thanks to Sigi Koko of Build Naturally.
I do a 2-layer adobe floor, mostly because this allows me to pour the thick base layer before the exterior walls are completely closed in. That extra air-flow speeds up drying time (and eliminates a highly humid interior later in construction). Read more …